1.
The Optimization of Capacity Boiler Efficiency 26 Tons/Hours With Fuel Alumination and Statistical Product and Service Solutions (SPSS) Analysis. AJRI. 2020;2(2):113-185. doi:10.34306/ajri.v2i2.70